Join our early access program and receive free access

For Architects

Upload Your Plans. Get a Full Compliance Review in Minutes.

Site Plan Agent checks completeness and compliance against your city's actual zoning ordinance — with exact code citations — before you ever talk to a planner.

Verify ADA parking compliance and accessible path of travel.

Site Plan Agent:

ADA parking — FAIL.The plan shows a parking area, but there are no clearly labeled accessible (ADA) stalls, access aisles, or compliant signage. Per ADA standards, at least one accessible space with proper striping and an accessible route to the building entrance is required. See parking area adjacent to building entry on Sheet A101.SP.

site_plan_set.pdf

Civil — Sheet C1.0

Analyzed

Uploaded site plan sheet

Completeness Pre-Check

North arrow & scale

Building footprint

Parking layout

Site boundaries

General notes block

ADA parking callout

Stormwater / drainage

Utility connections

⚠️

Landscaping plan

Summary

5

Pass

3

Fail

1

Review

The Daily Grind

Every Resubmittal Adds Weeks You Don't Have

Weeks of Waiting After Submittal

After submitting a plan set, architects wait 2–4 weeks for a plan checker's comments only to discover a missing seal on sheet 7 or a setback that fails by 3 feet. Every cycle adds weeks to the project timeline.

Completeness Surprises at the Counter

Each jurisdiction has its own submittal checklist. A missing cover sheet, absent ADA parking callout, or forgotten stormwater plan triggers a rejection even when the design itself is solid.

City-Specific Rules With No Central Source

Berkeley's setback minimums aren't Riviera Beach's. Every project in every city means a fresh round of ordinance research. Junior staff miss city-specific nuances that experienced reviewers catch immediately.

Manual Cross-Referencing of IBC and Zoning

Verifying FAR, lot coverage, height limits, parking counts, and landscaping percentages against the applicable ordinance is tedious, error-prone work — especially when done under deadline pressure.

First submittal. Cleaner plans. Fewer revision cycles.

Why It Matters

Know Before You Submit

The real value isn't just speed — it's arriving at the counter with a submittal that's already been reviewed against the city's actual rules.

Cleaner First Submittals

Catch completeness gaps and compliance failures before the plan is submitted. Fewer first-round rejections means fewer resubmittal cycles and faster project timelines.

Exact Code Citations

Every check result includes the relevant code section (e.g. 'Sec. 31-605(a)(1)') and the extracted text — so you know exactly what rule applies and where to find it.

City-Specific Ordinance Accuracy

The system is connected to city-specific zoning ordinances through a vector database. When you work in Berkeley vs. Riviera Beach, the AI checks against that city's actual rules — not a generic template.

Visual Evidence on the PDF

AI highlights bounding boxes on the PDF showing exactly what it looked at for each check — so you can verify the finding and communicate it precisely to your team or client.

Junior Staff Code Support

Site Plan Agent acts as an always-available code expert on every project — reducing the risk of missed city-specific requirements regardless of who is doing the submittal prep.

Reduce Revision Rounds

By validating plans before submission, firms cut resubmittal rounds, reduce rework costs, and protect relationships with planning departments and clients.

The Solution

How Site Plan Agent Works For Architects

Upload your PDF plan set and the AI runs two types of checks automatically — completeness and compliance — against that city's actual zoning ordinance. No special software. No email chains. Results in minutes.

Upload Any PDF Set

Upload a full PDF site plan set (up to 50 MB) directly in the browser — no special software, no email chains. Works with multi-page sets: architectural, civil, structural, and MEP sheets all in one upload.

Auto-Classification

The system auto-classifies sheet disciplines (civil, architectural, structural) from the uploaded PDF — no manual tagging or sorting required before the review begins.

Fast Batch Check

Runs up to 50 checks simultaneously on the uploaded PDF. Results delivered in seconds — pass / fail / needs more info — each with a code section reference and the PDF page number where the evidence was found.

Deep Reasoning Mode

AI first observes every page, then reasons through each compliance check with step-by-step logic, then concludes with a final verdict and code citation. Results stream in real-time as the AI works through your plan.

1. Completeness Review

“Does your submittal have everything it needs?”

Cover sheet, sheet index, vicinity map

Professional seals (PE / AIA) on all applicable sheets

Code analysis / zoning narrative

All 4-directional site photos

Elevations from all sides, floor plans, section details

Door / window / material / finish schedules

Foundation plans, framing plans, rebar schedules

Drainage / stormwater plan, utility connections

ADA parking, landscaping plan, loading zones

2. Compliance Review

“Do your dimensions actually meet the code?”

Front, side & rear setbacks vs. City minimums

Lot coverage % vs. Zoning maximum

FAR (Floor Area Ratio) vs. Allowed limit

Building height vs. Zoning cap

Parking count (standard + ADA) vs. Required minimum

Landscaping % vs. Required minimum

Structural details — CMU wall height, rebar spacing, footing depth vs. Code specs

Real-World Impact

What's In It For the Architect

Pain Point TodayWhat Site Plan Agent Does
Submits plans → waits 2–4 weeks for commentsGets an instant pre-check before submitting — catches issues in minutes
Gets rejected for missing a seal on sheet 7Completeness check flags every missing item before submission
Doesn't know this city's setback rulesAI pulls the actual ordinance and tells you if your 12 ft setback fails a 15 ft requirement
Has to cross-reference IBC, zoning codes manuallyAI cites the exact section (e.g. 'Sec. 31-605(a)(1)') with the relevant text
Resubmits 2–3 times adding weeks to project timelineFirst submittal is cleaner — fewer revision cycles
Junior staff missing city-specific code lookupsAI acts as an always-available code expert on every project

The Compounding Benefit

Every City. Every Project. Actual Rules.

Every project in every city has different rules. The system is connected to city-specific zoning ordinances through a vector database — so when you work in Berkeley vs. Riviera Beach, the AI is checking against that city's actual rules, not a generic template. The more cities you work in, the more value you get.

Plan Check Feedback

2–4 Weeks

Minutes

Resubmittal Rounds

2–3 Cycles

Fewer

Code Research Per City

Manual Hours

Automated

Ordinance Coverage

Generic Rules

City-Specific

Upload Your Plans. Get a Full Review Before the Counter.

See how Site Plan Agent checks your plans against the actual city ordinance — completeness, compliance, and exact code citations — before you ever talk to a planner.

Schedule a Demo